Missouri Land Surveyor CE (PDH) Requirements (2026): 20 Hours Every 2 Years

At a Glance
20
Contact Hours
2 yr
CE Cycle
Yes
Online Allowed
Yes
Carry-Over
Missouri professional land surveyors must complete 20 professional development units (PDUs) every two-year renewal period, including at least 2 PDUs in Surveying Standards. One PDU equals 50 to 60 minutes of qualifying activity, up to 10 excess PDUs can carry into the next cycle, and surveyors who cannot meet the requirement may go inactive instead.
Disclaimer: This information is for reference purposes only. Requirements are set by the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects (APELSLA) and may change. Always verify current requirements directly with the board.
Never miss your Missouri PLS renewal

We're building a tool that tracks your CE hours and reminds you before your deadline — no more digging through board sites to check where you stand. Join the waitlist:

Requirements Overview

The Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects (APELSLA) requires each licensed professional land surveyor to complete a minimum of 20 professional development units (PDUs) during the two-year period immediately preceding renewal (20 CSR 2030-8.020) — a lighter load than the 30 hours Missouri asks of professional engineers.

Of those 20 PDUs, at least 2 must be in Surveying Standards, pointing to 20 CSR 2030 Chapters 16 and 17 and/or Chapters 60 and 327, RSMo (a requirement effective March 30, 2016). A PDU is earned for every 50 to 60 minutes of qualifying activity.

Excess hours help you later: up to 10 PDUs may be carried into the next two-year period. New licensees (held less than 12 months at first renewal) and those on active military duty are excused, and a surveyor who cannot meet the requirement may place the license on inactive status rather than renew as active.

Mandatory Topics

TopicHoursFrequencyNotes
Surveying Standards 2 Every renewal At least 2 of the 20 PDUs must be in Surveying Standards (20 CSR 2030, Chapters 16 and 17, and/or Chapters 60 and 327, RSMo) during the two-year period immediately preceding renewal.

Exemptions

How You Can Complete Your CE

💻
Online / Distance
Allowed, no limit
🏫
In-Person / Live
Allowed

Missouri CE Rules & Limits

Details specific to Missouri that generic CE guides tend to miss:

Tips for Missouri PLSs

Sources

How this page is verified
  • Cross-checked against the official published rules of the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects (APELSLA)
  • Each stated figure recorded with its exact source excerpt
  • 1 source cited — 1 primary (official board)
How we compile & verify this data →

PLS Requirements in Nearby States

Other Professions in Missouri

All Land Surveyor CE Requirements by State

Open any other state's Land Surveyor CE (PDH) requirements, or see the full Land Surveyor CE hub to compare every state in one table.